Second unit operation · Gravity plant
Wash screen WS-2
The 2 mm cut of our small-scale gold plant. It takes the washed feed from the grizzly feeder, rinses the fines through a 2 mm mesh to the concentrator, and walks the gravel off the end over a riffled sluice that catches coarse gold. Built locally around two standard vibrator motors.
Prototype design, Rev A · not yet builtWhere it sits in the plant
The screen makes the split the whole plant depends on. Everything under 2 mm goes on to the centrifugal concentrator, which recovers fine gold. Everything over 2 mm runs off the end across a riffled sluice, which catches coarse gold and nuggets before the gravel is stacked.
WS-2 is built locally around two standard vibrator motors and replaceable mesh panels.
- 300-GZ-01Grizzly feederWash, reject stones over 25 mm, meter the feed
- 300-SC-01Wash screenSplit at 2 mm; oversize over the sluice
- 300-CN-01Centrifugal concentratorHolds gold and heavy minerals
- 400-TB-01Shaking tableUpgrades the concentrate
- 400-FU-01Smelt with boraxGold doré, no mercury
How it works
Four steps. Pick one to see the part on the model.
Design basis and sizing
Sized with the standard screen-area method (the VSMA method) from the plant's design basis: 2.86 t an hour of washed feed from the grizzly feeder, of which 2.0 t is finer than 2 mm.
| Item | Value | How we got it |
|---|---|---|
| Fines to pass, U | 2.0 t/h | Concentrator feed in the plant design: 70% of the 2.86 t/h run-of-mine is finer than 2 mm |
| Basic capacity, A | 6.6 t/h per m² | Read between the 1/16 and 3/32 inch apertures for a 2 mm opening |
| Wet screening, E | × 1.44 | Sprays at 5 to 7 US gallons a minute per short ton of solids; read between 1/16 and 1/8 inch |
| Oversize, B | × 0.96 | 30% of the feed is over 2 mm |
| Efficiency, J | × 1.15 | 90% of the fines through, the usual target for a wash screen |
| Other factors | × 1.0 | Single deck, square mesh, bulk density 1.6 t/m³; half-size fraction assumed at the method's 40% reference |
| Area needed | 0.19 m² | 2.0 ÷ (6.6 × 1.44 × 0.96 × 1.15) |
| Area chosen | 0.5 m² | 2.6 times the area needed, to carry clay, blinding and surges in feed |
| Bed depth at the end | about 1 mm | 0.86 t/h of gravel across 0.5 m at about 0.3 m/s; the limit is four times the aperture, 8 mm |
| Spray water | 3.6 to 5.0 m³/h | The same 5 to 7 gallon rule; with the grizzly's 3 m³/h it makes up the plant's 7.1 m³/h of slurry water |
| Drive | 2 × 0.37 kW | Counter-rotating vibrator motors give linear motion; matches the 0.75 kW in the plant's load list |
| Steel | about 0.3 t | Mild-steel plate and standard sections |
Sizing from the VSMA method as set out by PowderProcess.net. Design values for the prototype, Rev A; the test plan below confirms them on site ore.
Built locally
The screen box, frame, pan, spray bars and sluice are cut, drilled and welded from mild steel in a local workshop. Only the two vibrator motors, the mesh panels and the rubber mounts are bought in, and all three are standard parts.
| Part | Made from |
|---|---|
| Screen box and feed box | Mild-steel plate and hollow section, made locally |
| Deck panels | Woven stainless mesh on frames, bought in and replaceable |
| Vibrator motors | Standard three-phase vibrator motors, bought in |
| Mounts | Rubber buffer mounts, bought in |
| Frame, pan and sluice | Steel angle and plate, made locally |
| Spray bars | Galvanised pipe and ball valves |
- Mesh you can change in minutesThe deck is made of panels held by wedges, so a torn or blinded panel is swapped without stopping for long.
- No gearbox, no beltsThe motors bolt straight to the box. Nothing to align, and nothing to slip in the rain.
- Gold caught twiceFine gold goes through the mesh to the concentrator; coarse gold in the gravel stops in the riffles of the sluice.
- Safe by designGuards over the motors, a lockable isolator within reach, and a rule that nobody reaches onto a running deck.
Prototype test plan
Built and tested together with the grizzly feeder in Osun State, on real run-of-mine ore, before the design is frozen.
- Workshop runPass: straight-line motion at 45° and the design stroke.
Run the motors, confirm they turn in opposite directions and measure the stroke. - Cut qualityPass: under 10% of the gravel stream is finer than 2 mm.
Sample the gravel and the fines streams every hour of a shift. - ThroughputPass: 2 t/h of fines to the concentrator without flooding the deck.
Feed the full 2.86 t/h for a 10-hour shift. - Blinding and waterPass: no more than one clearing stop a shift; 5 m³/h of spray water or less.
Log every stop to clear the mesh and meter the spray water. - Fatigue checkPass: no cracks.
Inspect the welds around the motor beam after 100 operating hours.